DATA ENTRY

CONVERGE PROJECT
- TRACKER OF A DESIGN ENGINEER
- - In this tracker as a Team Lead, I encode and know if a site is already have an HLD (kmz file), if the site is already surveyed or if a site is already have an As-plan (LLD). I also encode here the details of the Proposed As-plan and the details of the As-plan after it was approved by the client. I also put here the assigned Design Engineer of the site.
- TRACKER OF AFI PLANS
- - AFI Plans is the approved plan of the Client, this is also the plan that’s going to be used in site for implementation.
- In this tracker I encode the details of the AFI Plans.
- TRACKER OF PURCHASED ORDER NUMBER FOR WORKABLE AND NON-WORKABLE SITES
- MONITORING OF IMPLEMENTATION SITES
- In here, I tracked and encode whether the site is already Implemented, for activation or drop using Excel.
I encode here the target lines that need to be implemented, and I also used this to know which site is need permitting.
- TRACKER OF AS-BUILT PLAN
- - As-Built plan is the Plan after it was implemented, this is the final plan of a Site.
- - As the Team Lead, I encode here the details of the As-built plan, who is the assigned Design Engineer, and whether if the As-built plan is already approved by my Bosses for the Sunvizion.
- THIS IS THE TRACKER I MADE FOR THE PLANS (SOFT FILES OR HARD FILES)
- I use this tracker to know if the files of a certain site are already complete or not for the purpose of Billing.
- LIST OF POLE TAGS FOR THE POLE THAT HAS BEEN BUILT TO A SITE.
-As the Team Lead, I need to request and compile the Pole Tags. I also need to include the Site Name, Longitude/Latitude, the size of the pole, and it’s usage to the tracker.
- LIST OF STENCIL ID’S THAT GONNA BE PUT IN LCP/NAP BOXES.
- - As the Team Lead, I need to request and compile the Stencil ID’s. I also include the Site Name, Homing Node, and the # of LCP’s to the tracker.
- - LIST OF NAP AUGMENTATION’S
- I also request and compile the NAP Augmentation’s. It includes the city, Barangay., Site Name, No. of LCP and NAP, and the total lines.
GLOBE AC POWER PROJECT
- TRACKER OF GLOBE AC POWER
-This is the tracker for Globe AC Power, we use
this data to know the details of a certain site.
- Just by looking into this tracker we get to know the Scope of a site that we need for the Proposed TSSR and it's location.
- TSSR TRACKER
This is the TSSR Tracker I made.
This tracker helps me to monitor the status of the TSSR whether if the TSSR is already passed or approved by my bosses and the client. I also used this tracker to know if a TSSR is need a revision.
I used dates to know the status because, in this way we can monitor how long does a TSSR to be approved by my Bosses and the Client so that I can follow it up if it takes them a week on the For checking status.
- EE PLAN TRACKER
This is the EE Plan Tracker I made.
Just like the tracker of the TSSR, I used this tracker to monitor the status of the EE Plan whether the EE Plan is already approved by my bosses and the client.
I also used dates here to monitor how long does it take for the EE Plan to be approved by my bosses and the client so that I can follow it up if it takes a week for them to check it.