Hey I am Apple Grace

More Info About Me

Apple has more than 14 years working experience in Engineering and Construction industry specialising in engineering technical support, major project administration and engineering and construction document production and coordination.

Apple has wide experience working in Australia and internationally on major transport infrastructure projects for both rail, roads and mining and resources. Since coming to Australia, she has broadened her capabilities and developed a robust understanding of rail engineering and systems principles across many disciplines. This has built on her strong experience in information management, project administration and controls.

Apart from project delivery, Apple is also experienced in proposal support and coordination.

Apple Grace Diaz
Bulacan, Philippines
Freelancer
View Work Hire Me

My Skills and Competencies

Social Media Manager
Facebook Ads Management
Data Entry
Content Creator

Certificates

1

My Experience and Education

  • EXPERIENCE
  • EDUCATION
2004
Bachelor of Science in Civil Engineering

Bulacan State University

2016 - 2022
Aurecon Australasia Pty Ltd.
(Project Administrator / Document Controller / Project Controller)

The State Government has announced Bellevue as the preferred location for the new multi-functional depot, Bellevue Depot, which will include an Assembly Facility, High Voltage (HV) Testing Facility and various maintenance facilities. The works for this depot will be delivered in two stages.

Besides, to support the manufacture of the new railcars, the Bellevue Depot will incorporate facilities for maintenance and stabling of the PTA B-series railcars, which will be displaced from the Joondalup Line and Mandurah Line by the new C-series railcars, a dual gauge facility for the maintenance of the PTA diesel-powered railcars/track machines, a dual gauge wheel lathe and a driver sign-on facility.

The site will facilitate the assembly of the new Alstom EMU and DMU railcars over an extended period.
The site will become a maintenance facility for another 78 EMU sets (234 cars), providing light and
heavy maintenance/overhaul facilities, a wheel lathe and bogie/engine drop, train wash plants,
underframe and interior deep clean facilities as well as stabling for 120 electric railcars. Additionally,
there is a diesel maintenance facility with open access roads for use by local freight operators
(locomotive maintenance) and further diesel ancillary facilities (including provisioning and fueling).

Apple is assisting a multidisciplinary team, which includes subcontractors, in delivering the detailed design of the Bellevue Depot. She coordinates and ensures that deliverables and milestones are submitted as scheduled. Some of her tasks include assisting the SEM on his day to day tasks, and program administration including workshop organization, minute taking, team weekly meetings and inductions.

2020 - 2022
Aurecon Australasia Pty Ltd.
(Document Controller)

The PTA commissioned Coleman Rail and Aurecon to deliver the detailed Design & Construct project for a Flash Butt Welding (FBW) facility at Kenwick to replace the existing facility located at the Bellevue Rail Yard currently being used by Arc infrastructure. The PTA is repurposing the Bellevue yard as a Railcar Assembly Facility and major maintenance depot.

Apple is Aurecon’s Document Controller for the project. Apple uses the document control platforms TeamBinder and Projectwise in delivering this project.

My Services

Social Media Management

Social Media Marketing is telling the world you’re a rock star. Content Marketing is showing the world you are one.

Facebook Ads Management

Facebook ads by getting inspiration from a few of our ad examples that have seen success.

Graphic Design

Graphic design is a craft where professionals create visual content to communicate messages.


Works

Let's work together !

I am available for freelance projects.
Hire Me

Get In Touch

Address :
Bulacan,
Philippines


Copyright © Myprofile.ph